Initial Consultation & Assessment
We check deck condition, slope toward the drains, and what is already on the roof. Existing layers, ponding marks and soft underfoot spots decide whether the new system goes over the old or the roof comes off.
Detailed Estimate & Planning
Old membrane comes off where needed, wet insulation is cut out, and the surface is swept clean. Where the base ply goes to the deck, the deck is primed. Bitumen only bonds to a clean dry surface.
Expert Installation
The base ply is laid and welded, then the cap sheet runs over it with laps offset from the base so no seam stacks on a seam. Flashings and detail plies go in as the field progresses.
Final Walkthrough & Cleanup
Seams are probed, drains are checked under running water, and a fire watch stays on site after the torches are shut down. Then we walk the finished roof with you before the site is cleared.